New Major Biogas Plant Opens in Dorset to Process Food Waste into Biomethane
A major new biogas plant has officially opened at Eco Sustainable Solutions' Parley site in Dorset, capable of processing more than 50,000 tonnes of food waste annually. The facility, representing an investment of just under £20 million, handles food waste from Bournemouth, Christchurch, Poole, and the surrounding areas, operating around the clock with the capacity to recycle over 1,000 tonnes of food waste each week.
How the Facility Works
Using anaerobic digestion, the plant converts collected food waste into biomethane. It produces 900 cubic metres of gas per hour, which is enough to heat approximately 7,000 homes. In addition to renewable gas, the facility also generates a nutrient-rich biofertiliser designated for agricultural use.
Background and Development
Planning permission for the site was granted over a decade ago, with construction officially beginning in 2024. The development created 50 construction jobs and currently employs six full-time operators. Eco Sustainable Solutions—which began 31 years ago as a small composting operation—now employs 53 people and maintains an annual turnover of more than £20 million. According to managing director Justin Dampney, the project was developed in response to the UK Government's Simpler Recycling reforms and marks a significant milestone in the company's 30-year history.
Official Opening and Industry Reception
The facility was officially opened by Simon Boyd, vice-president of the Dorset Chamber and managing director of REIDsteel, who symbolically marked the occasion alongside Justin Dampney by turning a valve to let gas from the facility enter the grid.
Expressing his perspective on the project, Simon Boyd stated:
"I was absolutely stunned by what this plant can do. Being someone who gets rid of their food waste each week, then seeing that it can go back into a system that generates gas that can go into the grid and supply up to 7,000 homes with heating is a phenomenal achievement."
Mr Boyd added that he considers the facility one of the most outstanding businesses in Dorset and a credit to both the company and the county.
Reflecting on the collaborative effort behind the project, Justin Dampney noted that safety and design standards were never compromised during development, resulting in a facility intended to serve the region for decades to come. This initiative builds on Eco's broader environmental efforts; in 2025, the company prevented more than 120,000 tonnes of carbon dioxide from entering the atmosphere by diverting waste from landfill.
(Note: This article was prepared with AI assistance based on supplied reference material from Eco Sustainable Solutions.)